Project Description:
Removed existing roof system, installed tapered insulation to eliminate ponding water. Installed modified bitumen roofing system.
Project Highlights:
At the time, this was the 3rd tallest building in Mobile. Removal of old materials and transportation of new materials presented challenges. All work had to be done without disturbing the tenants.